Skip to content
B2B fashion jewellery from Guangdong · stock lines from 10 pcs · custom OEM/ODM · CAD in 48 hours Request a price list WhatsApp Email
PS PromistarsFashion Jewellery

Buyer's guide

MOQ, and the first order you can actually exit

Why the minimum exists, what a realistic first order looks like in each material, and how to test a market without carrying the stock into next season.

Jeweller's bench seen from above with tools and a tray of stones

MOQ is the number buyers push on hardest and understand least. It is not a bargaining position: it " is the point at which a factory stops losing money on a design. This guide explains where the number " comes from, what a realistic first order looks like, and how to test a market without ending up with " a cupboard full of stock you cannot sell.

Where the minimum actually comes from

Three costs, none of which scale down:

  • Tooling. Silver and brass pieces need a mould; steel needs machining setup or a die. It is " a one-off cost per design, which is why a reorder is cheaper than a first order and why a supplier " who quotes you a very low minimum is usually recovering the tooling inside the unit price.
  • Plating and finishing runs. A plating bath or a vacuum chamber is a batch process. Twenty " pieces and two thousand pieces occupy similar rack space and machine time.
  • Bench work. Setting, polishing and engraving are per-piece, but the setup before them is " per-design.

The practical consequence: the minimum is per design, not per order. That is a lever you can use. " Ten designs at their individual minimums is a perfectly normal first order, and it gives you a range " rather than a single bet.

RangeMinimum per designSamplingProduction / dispatchWhy the number is what it is
Sterling Silver jewellery30 pcs10–15 days20–30 daysMould is a one-off cost; reorders do not repeat it
Stainless Steel jewellery50 pcs7–12 days15–25 daysMachined and cast setup is cheap; unit price drops hard at 500 pcs
Brass & Copper jewellery30 pcs7–12 days12–20 daysCasting plus plating; the fastest route to a new colour
Any material — stock lines10 pcs—3–7 daysHeld in stock; mixed cartons across materials
Minimums are per design, not per order. A mixed carton carries the sum of its designs. Timelines start from receipt of your brief and artwork.

A first order that does not hurt

This is the structure we recommend to a buyer opening a new market, and it is deliberately " unexciting:

  • Start on stock lines. 10 pcs per design, dispatch in 3–7 days, and " they can be mixed across all three materials in one carton. You are buying information about your " market, not inventory.
  • Put most of the budget into 316L and brass. They are the cheapest to test and the least " sensitive to metal price movement, so a mistake costs less.
  • Buy two or three silver pieces, not twenty. Silver is the tier that carries a real metal " cost, so test the price point with a small number before committing weight.
  • Keep the size run narrow. On rings, a single size or a two-size spread costs less and " tells you almost as much as a full run — the full run is for the reorder, when you know what " sells.
  • Customise the packaging before you customise the product. A printed card or pouch with " your mark turns stock into your line at a fraction of the cost of a custom casting.

Why the reorder is the real order

The economics of jewellery only work on the second order. By then the tooling is amortised and you " buy on sell-through data rather than judgement. Two things make a reorder fast:

  • Keeping the approved drawing on file. We keep the drawing and the sample standard, so a " reorder is a repeat rather than a re-development. If you change a specification between runs, change " it on the drawing.
  • Staying inside the plating specification you approved. A reorder is where a buyer is " tempted to shave the micron figure to hit a price. That is the decision that produces the returns " you were trying to avoid.

Four pitfalls worth avoiding

  • The incomplete size run. Ordering one size of a ring in quantity looks thrifty until you " cannot sell half of it. Either sell to a single-size order book, or buy a spread.
  • Colour drift between batches. Plating colour varies with the bath and the batch. Approve a " physical sample and keep it as the standard, rather than matching to a photograph.
  • Freight volume. Packaging and boxes are volume, not weight. A rigid gift box can cost more " to ship than the jewellery inside it, so compare landed cost rather than ex-works price.
  • Testing left to the last minute. If your market requires nickel-release or REACH " documentation, arrange it before the run, not after the goods are on the water.

The honest summary. A first order is a market test, so make it " small, broad and reversible: stock lines across two or three materials, most of the money in the cheap " materials, packaging branded before products customised. Then reorder the winners in the material " their price point actually deserves.

FAQ

Questions this guide raises

Can you go below your stated minimum?
Not on a custom design, because tooling and setup are real costs — a smaller run would simply carry them in the unit price and you would pay more per piece for the privilege. What we can do is start you on stock lines at 10 pcs per design, or apply a stock silhouette with your own marking at no design fee. That gives you a low-risk entry without pretending the tooling is free.
Is the minimum per design or per order?
Per design. So a first order of eight designs carries eight minimums, not one large figure. Practically that means you can build a spread — a couple of silver pieces, some steel volume lines and one or two brass colour tests — and evaluate them together.
How much should a first order be worth?
Enough to learn something, little enough to lose without grief. We would rather see a first order split across three materials than a single large bet on one, because the useful output of a first order is which price tier your market actually buys at.
Do stock lines really ship in 3–7 days?
The lines marked as stock are held and dispatch in 3–7 days. Made-to-order pieces need sampling (7–15 days) and production (12–30 days depending on material), so if you need goods this month, start on the stock pages and reorder into custom production.
What happens if the goods are not what I approved?
The approved sample is the standard, and both sides hold it. If a delivery does not match the approved sample on dimensions, plating or finish, that is our problem and we remake it. This is exactly why we do not skip the existing-sample step: the argument is settled by the sample rather than by recollection.

Keep reading

Related pages

Silver vs steel vs brass

What each material does to your price and your returns rate.

Plating & finishes

Microns and methods, and the wording to specify.

Best sellers

The stock lines that reorder most, from 10 pcs per design.

Price list

Request the price list

Tell us the material and the quantity and you will get our current price list, stock availability and lead time within one working day.

Reply within one working day · CAD in 48 hours · sample before bulk production · no obligation.

What you get

Quoted line by line, not as a lump sum

  • ✓Metal or base, plating in microns, stones and packing priced separately
  • ✓Weight and dimensions on the drawing before anything is cast
  • ✓A physical sample approved by you before any bulk run
  • ✓Photographs of your pieces at every production milestone
  • ✓Freight quoted for your route — courier, air or sea

Reply within one working day. No obligation, and no design file needed to start.

Get the price list

Send your line sheet. Get a price list the same day.

Tell us the material, the pieces and the quantity. You will get our current price list, stock availability and lead time — and if it is a custom design, a CAD drawing within 48 hours.

  • ✓Price list per material, with MOQ and lead time on every line
  • ✓CAD drawing in 48 hours on custom designs
  • ✓Physical sample before any bulk run
  • ✓Photographs of your pieces at every production milestone

Price list

Price list, one working day

Two minutes to fill in. No design file needed to start.

Reply within one working day · CAD in 48 hours · sample before bulk production · no obligation.